Contractor's crews will begin paving U.S. 2 from Sandpoint to Dover tomorrow. Work is expected to be completed by Oct. 14.
The old pavement surface will be ground down for a full-width resurfacing with new asphalt. U.S. 2 will be reduced to one lane weekdays from the Dover Bridge to 5th Street in Sandpoint. The speed limit will be 35 mph through the work zone corridor.
No comments:
Post a Comment